MacKenzie Creek is a tributary of the McLeod River in Alberta, located south of Hinton. This creek is home to Alberta native trout species, the Bull Trout (Salvelinus confluentus) and the Athabasca Rainbow Trout (Oncorhyncus mykiss). Both are considered “species at risk” under provincial and federal Acts.[LP1]  MacKenzie Creek is recognized to be an important spawning and rearing habitat for Bull Trout in the McLeod River. It is believed that the loss of this important habitat for Bull Trout would have consequences for the McLeod River population. The value of MacKenzie Creek as important Bull Trout habitat led to the closure of all angling in 2000, which is still in place today.


 [LP1]I simplified this because it’s complicated here: This population of bull trout is listed as threatened provincially but special concern federally, and ARTR is endangered federally but threatened provincially

Looking up Mackenzie Creek
Looking up Mackenzie Creek

In the MacKenzie Creek watershed, direct and indirect impacts from off-highway vehicle (OHV) use were identified as a threat to the Bull Trout population. The existing trail system was cut within MacKenzie Creek’s floodplain, paralleling the creek and requiring numerous instream crossings. Although erosion is a natural process, it can be exacerbated by anthropogenic (human-caused) activities. In the case of OHVs, they directly increase erosional pressure on the trail surface through spinning tires, and this is particularly harmful when riding in stream. Additionally, the old trail did not adequately drain water off the trail surface, leading to the formation of mud pits and trenches which filled with sediment-laden water that eventually ran down the trail and into the creek. One reason why sediment can be so detrimental to Bull Trout is that they require clean, small- to medium-sized gravels to build their spawning nests (called redds). High levels of sedimentation can threaten spawning habitat by burying clean gravels and smothering incubating eggs.


In 2018, Alberta Environment and Parks approached Freshwater Conservation Canada to partner on a rehabilitation project on MacKenzie Creek. The provincial government would lead the construction of a new and improved trail loop with well-designed bridges and drainage features to redirect OHV use out of the creek and its floodplain, while Freshwater Conservation Canada would focus on rehabilitating OHV fords and roll back sections of the former trail. The goals of the collaborative were to improve safety while reducing risk for this vulnerable population of Bull Trout.  


Over 40 sites were selected for rehabilitation along the old trail system. The on-the-ground work began in 2019, and over the last 7 years, we have been making visits almost yearly to complete the rehabilitation project as the new trail was being built. A rehabilitation plan was prescribed to each site, using bioengineering methods that varied depending on the needs and conditions of each site. The primary focus of the rehab work was to rebuild damaged streambanks, kickstart the recovery process and prevent future vehicle access through the old trails and creek crossings.


Figure 2 shows one of the 2025 rehabilitation sites, prior to rehabilitation. Most of the sites we rehabilitated looked very similar to this one, with the trail leading directly into an OHV ford crossing.

Figure 2: Site 3, prior to reclamation
Figure 2: Site 3, prior to reclamation

Bioengineering techniques


Figure 3 depicts the same site, this time after the rehabilitation was completed. This site used root wads to rebuild the height of the bank. The empty space between the root balls is filled with soil and held in place with a biodegradable coconut matting. With time, the bank will vegetate, and plant roots will grow down and strengthen the new bank.  Behind the bank restoration, the photo shows the old trail section that has been through a “rough and loose” treatment in which soil is decompacted and covered in woody debris to decrease the erosion potential and encourage plant growth. These treatments provide some immediate structure to reduce continued sedimentation and it sets the ecosystem on a trajectory to do its thing and recover and heal over time.

Figure 3: Site 3, post-reclamation
Figure 3: Site 3, post-reclamation

In addition to the streambank rehabilitation, we did a rough and loose treatment along 10-20 meters of the approach to each ford. The trail’s bare and compacted soil is more prone to erosion than vegetated, looser soils. The rough and loose process decompacts the soil, which decreases erosion because water can seep into the ground rather than immediately running off along the compacted ground surface. Plants have a much easier time growing in loose soils rather than compacted ones; therefore, the rough and loose will encourage faster plant establishment. 


Fieldwork

A group of three FCC staff headed out in August 2025 to finish the last of the rehabilitation sites. But it became apparent rather quickly that the MacKenzie Creek project was not done with us yet. To access our reclamation sites, we needed to ride in on the old trail using OHVs to get ourselves and all our gear mobilized. A rainy summer had left the already eroded trail muddy and rutted, and every trip down the trail further impacted the trail conditions. Our crew gained lots of experience winching ourselves out of muddy messes. Aside from issues with access, luck was generally not on our side that trip, and every day seemed to bring a new setback to keep us on our toes. Despite our best efforts, we were unable to finish our sites and would have to return to finish in 2026.


This year, we headed back up to the Hinton area with a bigger crew, two additional OHVs and a second excavator, hoping to be well prepared if any delays came up. There had been rain in the forecast, and we were all nervous to see how the trail conditions would be. Our staging location was a small dirt pullout that had turned to a muddy mess. Every morning we struggled to put our waders on and get our gear ready without getting completely covered in mud. The access to our sites was slightly less treacherous than the previous year, and we managed to get through the week with very minimal winching. The team finished off the rest of our reclamation sites, completing FCC’s portion of the project.


Our work at MacKenzie Creek was never without a few monkey wrenches thrown in, but there’s no denying it’s a beautiful part of the province, and we are grateful for the opportunity to have been involved in this recovery project.


This project was possible thanks to many partners and supporters over the years. Freshwater Conservation Canada’s reclamation work was supported by Elk Valley Resources (formerly Teck Resources) and Fisheries and Oceans Canada. The trail project was also supported by West Fraser Mills Ltd. (Hinton Wood Products), the Alberta Off‑Highway Vehicle Association, and Alberta Forestry and Parks.


For more information on the MacKenzie Creek Trail:



Consider donating so we may continue this important work

You will be directed to the payments page, where you will enter your details (name, address, payment, etc.)

Donation
$25
$50
$100

Comments


JOIN THE MOVEMENT!

 Get the Latest News & Updates

Fish in water

JOIN THE MOVEMENT!

CONTACT US.

We'd love to hear from you!  Whether you have questions, want to learn more about our work, or are interested in getting involved, our team is here to help.  Reach out to us by using the contact information below, and we'll be in touch as soon as possible.  Together, we can make a lasting impact on Canada's freshwater conservation efforts.  Thank you for your interest and support!

GET IN TOUCH

Freshwater Conservation Canada Logo

ADDRESS

CALGARY:

6020 2nd Street SE

#8B

Calgary, AB T2H-2L8

 

GUELPH:

100 Stone Road West

Suite 304

Guelph, ON N1G-5L3

PHONE

1.800.909.6040

EMAIL

CHARITY NUMBER: 11927 - 1690 - RR0001

Proudly 

Canadian flag

Canadian

Copyright © 2025 Freshwater Conservation Canada. All rights reserved

bottom of page